1. |
Utilisation of demolished concrete waste for new construction and comparing their compressive strength after 28 days with Normal aggregate concrete ( Mrs. Bharti Manjhi,) DOI: 10.46335/IJIES.2020.5.9.1 |
2. |
Review on: Construction Technique of Hyperbolic Cooling Tower (Pranali M. Fulzele,R.V.R.K Prasad) DOI: 10.46335/IJIES.2020.5.9.2 |
3. |
DESIGN AND FABRICATION OF FOOT OPERATED PLATE MAKING MACHINE USING BIO-WASTE (Uday Dudhe,Satish Sonwane,Siddhesh Thakare,Vishal Bhakare,Krunal Deotale,Saurabh Seware) DOI : 10.46335/IJIES.2020.5.9.3 |
4. |
EVALUATION OF GROUND WATER ARTIFICIAL RECHARGE SCHEMES IN CHANDIGARH (U.T.) (Lokmitra Meshram,) DOI: 10.46335/IJIES.2020.5.9.4 |
5. |
THE EFFECT OF GROUND GRANULATED BLAST FURNANCE SLAG AS ON ALTERNATIVE CEMENT REPLACEMENT MATERIAL IN CONCRETE AFTER 28 DAYS STRENGTH (AMANI SAHU,anisha mire) DOI: 10.46335/IJIES.2020.5.9.5 |
6. |
To Study the Effect of Seismic Analysis Of Hyperbolic Cooling Tower (Pranali M. Fulzele,R.V.R.K Prasad) DOI: 10.46335/IJIES.2020.5.9.6 |
7. |
Comparative Study on Flexible Type of Clutches (Nitin S. Sawarkar,Pranav R. Morchapure,Dr K. S. Zakiuddin) DOI: 10.46335/IJIES.2020.5.9.7 |
8. |
Kinect-based physical rehabilitation system for home use (Kanchan A. Kamble,) DOI: 10.46335/IJIES.2020.5.9.8 |